Bulletin Announcement on the Construction of Floodlighting Project in the First Phase of Huyu City


Tender No.: GYY200910089
Tendering Agent: No other entrusted owner: Zhongxin Suzhou Industrial Park Land Co., Ltd. Registration Deadline: 2009-11-09
Region: Jiangsu Industry: Water Conservancy Bridge Construction, Electrical and Electronic Appliances

Project number: GYY200910089
Project Name: Laker City Phase I Floodlighting Project Tenderee Name: Zhongxin Suzhou Industrial Park Land Co., Ltd. Project Approval Authority Name: Suzhou Industrial Park Management Committee Engineering Fund Source: Implementation Project Location: Yangchenghu Avenue North, Exhibition Industry Luxi Project Scale: 11 single small high-rise roofs and commercial street floodlighting sections:
Bid number, section name, contract method, estimated contract price (ten thousand yuan), planned delivery time
GYY20091008901 Lake Language City Phase I Floodlighting Project Public Bidding 160 2009-11-16
The maximum number of bids that applicants can apply for: 1
Registration Location: 2nd Floor, Market Building, No. 168 Wangdun Road, Suzhou Industrial Park Construction Project Tangible Market Plan Start Date: December 15, 2009 Planned Completion: April 30, 2010

The main qualifications that applicants should have:
Applicant Qualification Category and Level: City and Road Lighting Project Level 3 Proposed Project Manager Qualification Level: Level

Enterprise performance and reputation: In the past three years (subject to the date of contract signing), the company has undertaken a floodplain project for building construction with a single contract cost of more than 1.6 million yuan.

Project Manager (Director) Performance, Credit: The project leader has undertaken the floodlighting project of the building with a single contract cost of more than 1.6 million yuan in the past three years (subject to the contract signing date)

Other conditions: (1) the ability to independently conclude a contract; (2) the company is not ordered to suspend business, the bidding qualification is cancelled or the property is taken over, frozen and bankrupt; (3) the company has not been defrauded or won a serious breach of contract and Major project quality, safety production accidents, etc., were suspended by the relevant departments and suspended during the suspension period; (4) Applicant qualification categories and grades: Urban and road lighting level 3 and above qualifications, registered capital of 1 million yuan and above (5) The qualification level of the person in charge of the proposed project: the third-level project manager or the registered construction engineer of the second-level or above, and the project leader's safety production assessment certificate (B) certificate; (6) the important in the pre-qualification application The content is not inaccurate or falsified; (7) the enterprise has safe production conditions and receives a safety production license; (8) the project leader has no construction in progress, or although there are construction projects, but all construction tasks within the scope of the contract Near the completion stage, and has submitted an application for completion acceptance to the original contractor, the original contractor agreed to participate in the bidding competition of other projects; (9) The bidding and qualification examination must be handled by the legal representative of the enterprise (or the agent represented by the legal representative), and the entrusted agent must be the employee of the enterprise; (10) The project refuses to accept the comprehensive evaluation result of the construction unit of the park as C or Suzhou. Other bad credit bidders identified by the planning and construction department of the industrial park participate in the bidding; (11) Other conditions in compliance with laws and regulations; the registration materials are as follows: the identity document of the applicant, the labor contract, and the social security of the employee after January 2009 Proof (the social guarantee must be stamped by the social security department), the original authorization letter of the legal representative, the bid confirmation letter, the business license, qualification certificate, tax registration certificate, company profile, "safe production license", construction of the project leader The teacher's certificate and the "Project Leader's Safety Production Assessment Certificate (Class B)", the company and the project leader's similar project performance [including the following complete information of the project: completion acceptance report (or main experience receipt record), winning bid notice or direct delivery Notice, contract, award certificate (if any), etc.] All the above documents must be provided with the original check, and the copy is stamped with the official seal. Prequalification method: The following methods are used to prequalify less than 9 qualified units, all of which are short-listed; if there are no less than 9 qualified pre-qualification units, 9 units will be determined by random lottery to participate in the bidding. The project adopts a fixed unit price contract, and the payment method is as follows: the payment rate of the progress payment is 75% of the qualified work volume, and the completion acceptance is 80% of the qualified work after the completion of the data, and the audit settlement is completed and paid to the approved settlement price. 95%, after the expiration of the defect liability period, the balance is paid.

Announcement Information Tenderer Contact Address: 7th Floor, Real Estate Business Plaza, No. 158 Wangdun Road, Suzhou Industrial Park Contact: Shangyu / Wu Lingling Fax Phone/66606673
Zip code: 215123
mailbox:/
The registration time for this project is: Applicants are required to apply from 9:30 am to 11:30 am, and from 14:00 pm to 16:00 pm (public holiday, from November 9, 2009 to November 9, 2009). Except for holidays) To the tangible market registration project on the 2nd floor of the Market Building, No. 168, Wangdun Road, Suzhou Industrial Park, the registration person must bring his ID card and will be in the morning from November 9, 2009 to November 9, 2009. From 9:30 to 11:30, from 14:00 to 16:00 (except public holidays and holidays), (the project does not issue prequalification documents) to obtain prequalification documents.

Solar Engergy System

Solar energy system, off gird pv system, grid pv system, solar power system, Solar Panel system, on grid solar system, grid tied solar system,20kw solar system


Solar energy system include Solar photovoltaic system: 1. Off grid photovoltaic system mainly consists of solar modules, controllers, and batteries. To supply power to AC loads, it is also necessary to configure an AC inverter. 2. Grid connected photovoltaic power generation system. 3. Distributed photovoltaic power generation system. Distributed power generation or distributed energy supply.


solar cell type mono crystalline, half cut cell
solar energy pv system include on grid system, off grid system, hybrid system
solar configuration solar panel, inverter, battery, bracket cabels, mc4 connector



Product details and pic

Complete Off Grid Solar SystemOff Gird System 1 Jpg


Solar Engergy System,Gird Solar Power System,Pv System For Carport,Energy System Off Grid Solar System

PLIER(Suzhou) Photovoltaic Technology Co., Ltd. , https://www.pliersolar.com